Skip to content
Back to comparison
Jump Aero JA1 PulsePrototype
Not certified; Jump plans light-sport operation under Part 91 (MOSAIC)Fixed-wing

Jump Aero

JA1 Pulse

Standing tail-sitter biplane; first responder

Jump Aero's JA1 Pulse is a single-seat, all-electric biplane tail-sitter that flies a paramedic or first responder, not a patient, to the scene. Jump lists a 150 kg payload, a 250 kt dash, and an operational radius of about 50 km. Flight time is not published. Launch is in under 60 seconds, with eight cross-linkable 11 kWh batteries and a ballistic airframe parachute. It is trailer-portable without disassembly. In August 2025 the founder said a subscale demonstrator had transitioned on the full-scale flight computer and the full-scale prototype was midway through its build, with first hops expected around 2026. Jump plans to operate it as a light-sport aircraft under Part 91. Customers include Falck and Electro Ventures, and it has five US Air Force contracts. Not certified; no price.

Range
operational radius about 50 km

(varies with speed, reserves, and how the pilot flies the mission).

Payload
150 kg (pilot + kit)
Cruise
Not published

(chosen by the pilot, and traded against range and endurance).

Dash
250 kt
Flight time
Not published

(varies with the speed the pilot selects and the reserves kept for the mission).

Price
Not published
Seats
1
Battery / fuel
8 × 11 kWh independent, cross-linkable packs (88 kWh total)
First flight
Not published (full-scale prototype in build Aug 2025; subscale demonstrator has flown transition)
Entry into service
Not published

Full figures

Mission
operational radius about 50 km; deploy in under 60 s
Dash speed
250 kt
Payload
150 kg (330 lb), one responder + equipment
Batteries
8 × 11 kWh independent, cross-linkable; single HVDC fast-charge port
Hover
at 2,900 m density altitude with a failed propulsor; all-azimuth in 20 kt wind
Landing
10° slopes (most roads and driveways)
Safety
full envelope protection; no catastrophic single-point failures; ballistic airframe parachute; props above head height
Transport
on a flatbed trailer without disassembly
Development
subscale demonstrator transitioned on the full-scale flight computer; full-scale prototype in build (Aug 2025); bunny-hop trials expected around 2026
Customers
Falck purchase option and Electro Ventures deal for 10 aircraft (2023); Osage Nation trial MoU (2025); five US Air Force contracts
Cert path
light-sport aircraft under Part 91 (MOSAIC)

For

  • Fastest published dash on this list (250 kt)
  • Ballistic parachute; hovers with a failed propulsor

Against

  • One seat, EMS-only mission — not a family aircraft
  • Full-scale prototype not yet flown; no price